2020 Citywide Slurry Seal Project

In general, the work consists of street and multi-use trail (pathway) surface treatment (slurry seal) for various streets throughout the City, including surface preparation, crack seal, slurry seal, removal and replacement of pavement striping and markings, reconfiguration of striping and signing as provided for in plan sheet C-101 and C-102 and as directed by the Engineer, street signage installation and replacement, installation of one radar speed feedback sign system, object marker installation as directed by the Engineer, protection of existing utility structures, curb and gutter, cross gutter, traffic control, water pollution control and other related work as set forth on the project Figures, Plans and Specifications.
  Addendum 1 (click to expand/collapse)
Name Size
Addendum No. 1 2020 Citywide Slurry Seal 1.5 MB