Well 1 Vault Replacement Project CIPW13
In general the work consists of safety and operational improvements at the Well No. 1 vault. This includes replacement of the vault cover with a new traffic-rated OSHA compliant double access hatch. Replacement of the two existing sodium hypochlorite storage tanks with three new sodium hypochlorite storage tanks and the additional of a mixing tank inside the vault. Relocation of the existing chemical metering pump and power receptacle. Installation of a new forced-air ventilation system, as well as waterproofing of the interior vault.
Status
Bidding Closed
Prebid Date3/30/23 1:00pm
Bid Date4/17/23 2:00pm
Company & Contacts
City of Sonoma
Giuseppe Tomasino
Giuseppe.tomasino@ghd.com
Location
Sonoma, CA