Public Jobs

Bids due in 5 days
10/5/22 4:00pm
RFP - 2023 Water Rate Study
Bids due in 5 days
City of Sonoma
Sonoma, CA
The City of Sonoma is requesting proposals to prepare a water rate study to update the 2018 Water Rate Study for the City of Sonoma prepared by Raftelis Financial Consultants in June 2018 (2018 Study). The 2018 Study recommended a program of increased connection fees and a series of commodity rate increases for fiscal years 2018-19 through 2022-23. The water rate and fee increase program was considered and approved by Council at a public hearing pursuant to Proposition 218 on August 20, 2018. Ther new water rate and fee increase program took effect on Septemeber 1, 2018.
Bidding Closed
9/8/22 3:00pm
RFP - Construction Managment Services - Chase Street Bridge
Bidding Closed
City of Sonoma
Sonoma, CA
The Chase Street Bridge Replacement Project involves the replacement of a structurally deficient bridge along Chase Street. The existing bridge is a 23-foot wide, 24-foot long two-lane structure, which will be replaced by a single-span cast-in-place, post-tensioned concrete slab, 53-foot wide, 30-foot long concete bridge with 12-foot high abutments. The new bridge will have a new alignment consisting of two vehicle lanes with shoulders and sidewalks on both sides of the lanes. It will also include water and sewer facility relocations in addition to road approach improvements.
Bidding Closed
5/5/22 2:00pm
2022 Citywide Slurry Seal Project No. 2201
Bidding Closed
City of Sonoma
Sonoma, Ca
In general, the work consists of street and multi-use trail (pathway) surface treatment (slurry seal) for various streets throughout the City, including surface preperation, crack seal, slurry seal, removal and replacement of pavement striping and markings, protection of existing utility structures, curb and gutter, cross gutter, traffic control, water pollution control and other related work as set forth on the project Figures, Plans and Specifications.
Bidding Closed
11/4/21 2:00pm
Fryer Creek Pedestrian and Bicycle Bridge
Bidding Closed
City of Sonoma
Sonoma, CA
In general, the work consists of street and Class I pathway improvements, including installation of pre-engineered and pre-fabricated clear span steel truss pedestrian bridge, concrete bridge abutments and work at each approach to the new bridge, including new signage, striping and pavement markings, removal and replacement of existing curb and gutter, construction of new HMA pavement section, HMA overlay and grinding, concrete sidewalk, driveway and pathway, new ADA curb ramps and upgrading existing curb ramps for ADA compliance, tree removal, new street light, traffic control and other related work, as set forth on the project Plans and Specifications.
Bidding Closed
11/1/21 3:00pm
RFP - Construction Management, Inspection and Materials Testing Services
Bidding Closed
City of Sonoma
Sonoma, CA
The City of Sonoma (City), California, is issuing a Request for Proposals (RFP) from qualified firms or individuals (Proposer) with demonstrated experience in construction management, inspection and materials testing services for the Fryer Creek Pedestrian and Bicycle Bridge Project No. 1802, Federal Project No. CML-5114(020). The improvements generally consist of street and Class I pathway improvements, including installation of pre-engineered and pre-fabricated clear span steel truss pedestrian bridge, concrete bridge abutments and work at each approach to the new bridge, including new signage, striping and pavement markings, removal and replacement of existing curb and gutter, construction of new HMA pavement section, HMA overlay and grinding, concrete sidewalk, driveway and pathway, new ADA curb ramps and upgrading existing curb ramps for ADA compliance, tree removal, new street light, traffic control and other related work. To be considered, interested parties must submit their Proposals in accordance with the requirements set forth in the RFP.