CIP T-11, West Spain Street Rehabilitation Project No. 2502

In general, the work includes pavement rehabilitation and repair of localized failures with striping and signage improvements at locations along West Spain Street. Work includes asphalt pavement grinding, digout and repair of localized asphalt pavement failures, hot mix asphalt overlay, paving mat, removal and replacement of pavement striping and markings, roadway signs, protection and adjustment of existing utility structures, traffic control, water pollution control and other related work as set forth on the project Plans and Specifications.
Plans (click to expand/collapse)